CornwallRR
JMRI was used to create the dispatcher control panel for Nick Kulp's Cornwall RR
JMRI was used to create the dispatcher control panel for Nick Kulp's Cornwall RR.
Nick's layout uses a mixture of C/MRI and DCC.
The layout has 45 signal heads controlled by the C/MRI system. Most have red, yellow and green aspects; there are a couple that also indicate diverging routes with flashing yellow. The signals respond to occupancy to provide an automatic interlocking system.
Originally, the dispatcher worked via applications on two computers. One ran the C/MRI system that showed block occupancy and drove the signals, while another application on a different laptop was used to throw turnouts.